+44 (0)20 4577 2395 enquiries@adwdevelopments.com
Why Energy Procurement Should Be Treated as a Life Cycle Decision

Why Energy Procurement Should Be Treated as a Life Cycle Decision

Energy procurement is often treated as a commercial exercise, focused on tariffs, supplier selection, and short-term cost. In a net zero context, that mindset is no longer enough. Energy Procurement and Whole Life Carbon: The Module B6 Connection Within whole life...
Decarbonising Existing Buildings: A Critical Path to Net Zero

Decarbonising Existing Buildings: A Critical Path to Net Zero

Achieving net zero by 2050 puts the spotlight firmly on our existing buildings. While new, energy-efficient developments get plenty of attention, the majority of the building stock that will exist in 2050 is already here. This presents a significant challenge, and an...
UK Net Zero Carbon Buildings Standard 2025: Complete Guide – Part 2

UK Net Zero Carbon Buildings Standard 2025: Complete Guide – Part 2

As promised last week, we continue our focus on the UK Net Zero Carbon Buildings Standard (NZCBS) 2025. In today’s article, we first break down the types of emissions it covers, the life cycle reporting requirements, current performance limits, and the key design and...
Chatbot
Chatbot Avatar
Online
0/500