In anticipation of the upcoming UN Climate Change Conference (COP26) 2021, the UK government has announced its latest steps to tackle emissions and climate change – this time, by targeting a common source of carbon emission and landfill pollutant, halogen bulbs. The announcement surprises no one who is familiar with UK’s current trajectory of climate change initiatives. This was preceded by similar bans of other inefficient lightbulbs. These include incandescent (e.g., argon) bulbs back in 2009 as part of an EU-wide initiative. Looking ahead, the government is also proposing the ban of fluorescent lights from September 2023 onwards. Thus highlighting a lesson in designing adaptable buildings.

Lessons Learned from phasing out of halogen lights

So what lessons can we learn from the phasing out of halogen lights. At ADW Developments, we believe there is a strong message that construction projects should design with adaptability and disassembly in mind. This is applicable for new build, refurbishments or fitouts. Employing the thinking from credits within BREEAM such as Wst 06 ‘Design for disassembly and adaptability’ will make it far simpler and cheaper to adopt the technologies of tomorrow. Case in point, statistics from the UK government show that light fixtures with fixed bulbs (i.e., Halogenic solutions, or in the future, fixed fluorescent lights) that cannot be replaced are sent into landfill. These non-adaptive fixtures (including any other bespoke technology embedded into them such as non-standard connectors and sizes) account for over 100,000 (over 6.6% of the total) tonnes of electrical waste generated every year.

New solutions

Any building (including households) that use these old, fixed lighting solutions are expected to spend millions of pounds on replacements. The new solution, LED bulbs, outperform halogen bulbs in nearly every performance facet. LEDs cost just as much as halogen bulbs, last 5 times longer, and use up to 80% less power. Even the Colour Rendering Index (a measure of how well an artificial light shows the colour of objects that it hits), which has long been a domain of halogen bulbs with perfect 90+ scores, is falling under threat of newer and advanced LED lights (which are similarly scoring 90+).

Are LED bulbs the answer?

This has implications for the triple-bottom line of the scheme. LED bulbs make sense for many reasons. Firstly, financially (last longer), environmentally (consume less power, generate less waste), and socially (increase thermal and visual comfort of occupants). But is the case of LED / halogen bulbs an isolated example? Far from it. We believe this case represents a strong lesson that applies to many other facets of construction work and building services. From the scheme’s superstructure to its various services and components, it is possible to implement BREEAM methodologies. Methodologies include Mat 01Life cycle assessment’, Man 02Life cycle costing’, and Wst 06Design for disassembly and adaptability’. They identify design solutions (from a range of alternatives) that would be most consistent with the scheme’s triple bottom line. All of which are powerful steps in designing adaptable buildings.

How BREEAM Life Cycle Assessment (Mat 01) and Life Cycle Cost (Man 02) can help

A BREEAM Life Cycle Assessment (Mat 01) can be applied to appraise the whole-life emissions and global warming potential (GWP) of components and services. This combines with the Life Cycle Cost (Man 02) assessment that appraises the whole-life costing of the scheme (or components). These include the (i) initial investment costs, (ii) replacement costs, (iii) maintenance costs, and (iv) operating costs. The combination of these two services allows a scheme to identify alternative solutions (i.e., light bulbs) that provide the best through-life financial and environmental value.

UK Government plans to legislate against ‘premature obsolescence’

Adding to the importance of life cycle costing, the UK government announced in March 2021 its plans to legislate against ‘premature obsolescence’ of electrical appliances, forcing OEMs to manufacture spare parts and grant ‘right to repair’ for electrical appliances. Given this change, electrical appliances will be expected to have a longer service life in exchange for through-life repair costs. Therefore, making it important to select the right option.

Forward-thinking schemes (from the past decade) that had conducted LCA/LCC appraisals would already have identified the future operating / environmental / replacement costs of halogen bulbs (as an example, which also applies to other components such as HVAC, fabric, drainage) and would have prioritised the installation of LED bulbs, when LED bulbs were already beginning to gain traction.

What does the future hold?

BREEAM’s Wst 06 appraisal is, in many ways, a unifier. This design for disassembly and adaptability appraisal would have required the scheme to demonstrate the use of non-bespoke, disassembly-friendly, and adaptable services, connections, and fabric elements. A scheme that was designed for disassembly will find adaptation of LED lights to be relatively simple, compared to schemes that will need to rip out their old service connections and replace them with modern solutions. The value for designing with adaptability in mind has never been higher. Even today, schemes designed with disassembly and adaptability will find it much easier to implement the technologies of tomorrow. Although we have no way of predicting where certain technologies will go (would LEDs be replaced in the next 60 years?), expert insight that comes with this appraisal goes a long way in identifying long-running, nuanced trends that can help in designing adaptable buildings.

Find out how ADW Developments can help

ADW Developments has an established reputation in the industry for delivering best-practice environmental consultancy. We have dedicated service offerings for BREEAM Mat 01 Life Cycle Assessment, Man 02 Life Cycle Costing, and Wst 06 Design for disassembly and adaptability. If you have a new construction or refurbishment scheme in the works, please contact us to see how we can help your scheme follow life cycle thinking principles.

Anthony Waterman
Anthony Waterman

Have an enquiry?

Related Insights

Attend our CPD workshop

Attend our CPD workshop Oct 21 - Security Needs Assessments (SNAs) under BREEAM How to achieve Security Needs Assessment and SABRE Credits for BREEAM By Anthony Waterman About this event This session will explore the role of Security Needs Assessments (SNAs) under...

Explained: BREEAM Hea 06 Security Credit

How important is safety? The first thing any buyer checks in a property, whatever the use, is how secure are the facilities around it. Could someone easily break-in? Are there any security cameras nearby? What safeguards are there to discourage theft and other crimes?...

City of Dreams Mediterranean, Limassol, Cyprus

Project Description: City of Dreams Mediterranean is Cyprus’ first integrated casino resort. It is the only one of its kind in Europe and is expected to be the largest and premier integrated destination resort in the region. A world class development and a landmark...