Overheating Is a Whole Life Cost Decision

Overheating Is a Whole Life Cost Decision

Overheating is usually discussed as a compliance question. Since 2021, Approved Document O has set requirements for limiting overheating risk in new residential buildings in England, and most teams treat it as a box to clear before planning. That framing overlooks the...

Man 02: Why Life Cycle Costing Credits Are Won at Stage 2

Man 02: Why Life Cycle Costing Credits Are Won at Stage 2

Man 02 is one of the more straightforward credits in BREEAM to achieve. It is also one of the most frequently missed. The requirements are clear, the methodology is well established, and the evidence is not onerous. Project teams lose these credits regularly, and...

Why Two Carbon Assessments of the Same Building Can Disagree

Why Two Carbon Assessments of the Same Building Can Disagree

Two competent consultants assess the same building. They work from the same drawings and the same specification. Yet their whole life carbon figures come out different, sometimes by a margin that surprises the client. This is not a sign that one of them is wrong. It...

Bespoke Life Cycle Costing: The Analysis Behind the Decision

Bespoke Life Cycle Costing: The Analysis Behind the Decision

Most life cycle costing in construction exists to satisfy a requirement. A BREEAM credit calls for it. A planning authority requests it. A funder makes it a condition. In each case, the requirement sets the scope, and the analysis follows. A bespoke life cycle costing...

BREEAM Wst 05: Climate Adaptation and the Stage 2 Deadline

BREEAM Wst 05: Climate Adaptation and the Stage 2 Deadline

A building designed in 2026 will exist for years to come. It will spend most of its life in a climate that does not exist yet. BREEAM Wst 05, Adaptation to Climate Change, asks project teams to take that seriously. It is worth one credit, with an exemplary credit...

BREEAM Mat 05: Why Material Efficiency Starts at Stage 1

BREEAM Mat 05: Why Material Efficiency Starts at Stage 1

BREEAM Version 7 renumbered the material efficiency credit. What project teams knew as Mat 06 is now BREEAM Mat 05, and BRE streamlined the assessment process along the way. None of that is the interesting part. BREEAM Mat 05 behaves differently from almost every...

Pre-Demolition Audits: Why Timing Is Everything

Pre-Demolition Audits: Why Timing Is Everything

The value of a Pre-Demolition Audit has never been about the document itself. It comes from the decisions that the audit allows project teams to make. When teams undertake the audit early, they can identify reuse opportunities, inform demolition strategy, support...

Elemental vs Whole-Project LCC: Choosing the Right Strategy

Elemental vs Whole-Project LCC: Choosing the Right Strategy

Ask three people what Life Cycle Costing (LCC) means and you will often get three different answers. One may describe a high-level cost comparison completed at RIBA Stage 2 to inform structural or façade options. Another may refer to a detailed component-by-component...

BREEAM In Use: The Value of RSC 01 and RSC 03

BREEAM In Use: The Value of RSC 01 and RSC 03

Most buildings still treat materials as a cost. BREEAM In Use asks a different question: what if those materials still hold long-term value? Within BREEAM In Use, Rsc 01 and Rsc 03 encourage asset owners to think differently about existing buildings. Not simply as...

Earth Day: From Net Zero to Regenerative Buildings

Earth Day: From Net Zero to Regenerative Buildings

What Comes Next? Each Earth Day offers the built environment sector a moment to take stock. To ask not just how far we have come, but whether the direction of travel is still right. Net zero has been the defining ambition of the last decade. It shaped policy, guided...

Material Transparency & Dynamic Material Passports

Material Transparency & Dynamic Material Passports

The built environment is entering a data-driven era where material intelligence is becoming as critical as design and cost. As net zero targets tighten and circular economy principles move into regulation, the focus is shifting beyond how buildings are designed to...

Why Energy Procurement Should Be Treated as a Life Cycle Decision

Why Energy Procurement Should Be Treated as a Life Cycle Decision

Energy procurement is often treated as a commercial exercise, focused on tariffs, supplier selection, and short-term cost. In a net zero context, that mindset is no longer enough. Energy Procurement and Whole Life Carbon: The Module B6 Connection Within whole life...

Anthony Waterman